The Ultimate Working Environment
A building is successful when it enhances the standing of its occupants. Every detail of the design, construction and management of TAIPEI 101 Tower has been considered in terms of the impact on the performance of its tenants.

 
Permitted Use : any business, including finance and insurance
Slab to Slab Height : 4.20 meters
Internal Clear Height : 2.80 meters
Curtain Wall to Core Wall : 9.80 to 13.89 meters
Curtain Wall : Low-e, double glazed, aluminum framed
Mullion Spacing : 1.50 meters
Floor Loading: standard : standard : 400 kg/m2
high load areas :1,000 kg/m2
Raised Floor : 6 cm high
Lighting Level : 650 lux average at desk level on open plan layout
Handover Condition : includes suspended ceiling, lighting, air-conditioning and fire equipment.